Six Flags

Published on
Image description
Today we were once again honored to be invited up to Six Flags Magic Mountain to get another close-up look at Twisted Colossus. 

I know we've said this before, but it bears repeating ... WE ARE SO UNBELIEVABLY EXCITED FOR THIS RIDE. We seriously want to pull an Eric Cartman and freeze ourselves until the ride opens. But we also really do like seeing the progress of the ride. =)
Pictures and Words by Gregg Condon


Click on any of the pictures below to see a larger version. 
Picture
We've got a LOT of pictures to get to, so let's just cut right to the good stuff today. 

Our first look at the purple train. It's really awesome. 
Picture
Picture

The detail on the trains is amazing.

Picture

Look Ma, Comfortable restraints!!!

Picture

For those that like to see how things work.

Picture

Moving down into the ride itself

Picture

LOTS of track waiting to be placed

Picture

Not sure if it's all here, but it looked to be very close to all from what we could tell.

Picture

Supports are starting to go up on the final turnarounds.

Picture
Picture

And for the next elements to be done.

Picture

Close up of the two new lift motors, each is 200hp.

Picture

The new trains are about 500lb heavier than the Morgan Trains Colossus was using when it closed.

Picture
Picture

Safety first!

Picture

This is all new wood, and obviously new steel.

Picture
Picture

More stuff ready to be installed.

Picture

For those that were worried, they are painting the structure. Although anything that is in direct contact with track will remain unpainted. This is to give it that "steel" look, and also for track inspection.

Picture

Oh yeah, there are some new elements up on the ride to show you. =)

Picture

Don't cross the streams!!!!

Picture
Picture

And how do they get to the top gun stall? Like this.

Picture
Picture

Insane!!

Picture
Picture
Picture

Airtime!

Picture

Nerd shot

Picture

Moving further down into the structure

Picture

Exiting the High Five

Picture

Another interesting tidbit, RMC only is responsible for the track and any replacement of wood 10 feet below the track. So anything under that 10 foot mark has to be done by the park, which they are doing now, as you can see.

Picture

More twistyness

Picture

HIGH FIVE!!

Picture
Picture

The High Five and first turn-around

Picture

More of the Top Gun stall

Picture

No caption necessary ...

Picture

Watch out for that Train!!

Picture
Picture
Picture
Picture

There's not one piece of straight track in this entire picture

Picture

Coming down the drop

Picture

Moving over to the station

Picture

All of the bushes that were here are gone

Picture

Not sure what's going here, we suggested a beer garden. =)

Picture

New fence around station exit. So don't go in there!! =)

Picture

Ride Control panel!!!

Picture

New exit bridge

Moving over to Scream, it's re-paint is pretty much done. 
Picture
Picture

New fence installed around parts of the ride.

Picture
And last but not least, a look at the progress of the Steampunk District. 
Picture

Really like the way this turned out. And the trees are nice and trimmed down. We also asked what was replacing the Cool Zone, not sure. We did suggest another Beer Garden. =)

Picture

Very nice

Picture

Sandwich place, won't be "Subway" which is a good thing.

Picture

Lots of landscaping and new concrete going down

Picture
Picture

They were pouring concrete so we couldn't get to the other side. Also really do like the colors on the theater. Wasn't sure about it from the concept art, but that's very nice looking.

Alright, that's going to wrap it up for our tour. Thanks again to the park for having us out, we are so glad they are doing these and they did say there would be another one next month. 

We are also a few weeks away from any kind of opening date announcement, so as soon as we know anything, you will too. 

Thanks again for all of the support. We all appreciate it. 
If you enjoyed this update please share with your friends and make sure you "like" us on Facebook and "follow" us on Twitter and Instagram

If you have any comments, please share them below. 
6 Comments
Scott C. - 11 years ago
Thanks for the update. Love your Beer Gardens suggestions! Hey, are the hard hat tours open to the GP, or just you bloggers?
Gregg - 11 years ago
Hey Scott,
They are invite only by the park.
Rob M - 11 years ago
Great update Gregg. TC is looking amazing! Can't wait to get out there and ride it at some point when it opens! Thanks for covering the progress.
Gregg - 11 years ago
Thanks Rob. We agree, it's looking amazing. We can't wait for you to ride it either (because that means we'll be riding too). =)
Eric - 11 years ago
Twisted Colossus is coming along nicely. Quite honestly, at the current rate of construction, I think a Memorial Day weekend opening is not unreasonable. I hope they can open it by then.

At first, I wasn't a big fan of Scream!'s new color scheme, but it's growing on me. The blue color seems a bit lighter than the original blue that they used, but it could appear that way because of the orange paint.

I posted this somewhere else (but can't remember where) that putting one of the old Colossus trains—or even one or two cars—on that remaining track (for structural purposes) would also be a nice touch.

Imagine the Twisted Wiches shop rethemed for Fright Fest as "Twisted Witches." ;)
Gregg - 11 years ago
I don't think a Memorial Weekend opening is out of the question either. We've heard "rumors" about opening dates, but are holding off until we hear officially from the park. We definitely don't want to give anybody wrong dates and have them make travel plans that don't work out.

I also agree about Scream. It looks even better in person.

They did say on the tour that they are looking to have a "balance" of old and new in the queue (some of the old safety signs will be up in the queue).

LOVE that idea for Twisted Witches. Maybe that entire area could be a witch scare zone. Although I'd imagine they'll go with something SteamPunk'y in that area.

Categories

Archives